HOME NEWS COMPANY NEWS Thanksgiving 2026: Building Stronger Connections with Shear Studs

COMPANY NEWS

Thanksgiving 2026: Building Stronger Connections with Shear Studs

Every floor slab is a lesson in gratitude. A profiled steel deck carries the concrete while it cures, and after that the two materials share every load for the life of the building — but only because a row of headed shear studs transfers the force between them. Nothing in that system works alone. The same can be said of the people who make the studs: we ship because detailers draw, crews weld, and distributors sell. So this Thanksgiving weekend — tomorrow in the States, a couple of weeks back in Canada — we want to say it out loud to everyone who specifies our shear connectors: thank you.

Thank you for another year of decks

A shear stud is welded through the composite steel deck before the pour, and after the pour nobody sees it again. There is no second pass if the collar is undercut, no inspection once the slab is finished and the tower is opening. What is left is the record of how it was made — diameter, length, material, ferrule, welding procedure, and the batch test that confirmed it.

That is a serious job for a part that costs less than the freight to move it, and it is why we are grateful for customers who treat a stud order like a connection order: 13 to 25 mm headed shear studs to ISO 13918 and AWS D1.1 proportions, lengths cut to the project drawings instead of rounded to a catalogue size, ferrules matched so the collar forms where the procedure expects it. You ask the questions that keep us honest, and our answers are better for it.

Thank you as well to the distributors who keep our shear studs moving through markets we cannot visit, and to the crews who call when a ferrule does not seat the way it should. A complaint from a welder is worth more to us than a page of marketing copy, every time.

Our version of a holiday food drive

In most North American towns, November means somebody at the plant collects canned goods for the local food bank, and the guy with the truck drives it over on a Saturday. Our team has a version of that, except the calendar here runs on the Lunar New Year, so our holiday visit happens in February.

In February 2026, before the Spring Festival holidays, we joined the Shanghang · You Ai charity enterprise alliance for a visit to residents in need in the Shanghang Road subdistrict of Hedong District, Tianjin. The subdistrict office runs it every year; member companies send goods and people, and the route is planned around what families actually asked for rather than what is easiest to donate from a warehouse.

We bring it up in a Thanksgiving letter because it is how our small team answers a year of orders. Customers who keep buying from a supplier in Tianjin are the reason that supplier can spend a morning in its own city instead of on the phone. Gratitude that never leaves the inbox is just a sentence, so we put a date on the calendar once a year and show up.

Pre-holiday charity visit by the Shanghang You Ai alliance, Hedong District, Tianjin, February 2026

The pre-holiday visit organized by the Shanghang · You Ai charity enterprise alliance, Hedong District, Tianjin.

The subdistrict office later sent us an honor certificate for supporting the visit and the assistance work. A certificate is not a project reference, and we are not going to pretend it is. What it does say is that the participation was on the schedule rather than improvised — a standing commitment inside an alliance, not a photograph taken for a website.

Honor certificate from the Shanghang Road Subdistrict Office, February 2026

Honor certificate from the Shanghang Road Subdistrict Office, February 2026.

Member companies of the Shanghang You Ai charity enterprise alliance at the 2026 visit

Member companies of the Shanghang · You Ai alliance on the day of the visit.

Delivering holiday supplies to residents during the February 2026 visit

Delivering holiday supplies to residents during the visit.

Thank you for building with us

To the detailers who send us stud layouts, the welding crews who flag a problem instead of pouring over it, and the partners who have kept our connectors on their specifications for years: thank you. A shear connector transfers load between steel and concrete. A good supplier relationship does the same thing between two companies, and we are grateful you let us be on the other side of the deck.

Enjoy the long weekend — the parade, the leftovers, the second helping. If you are pricing a composite deck package for 2027, send the deck profile, stud diameter, length and welding position, and we will come back with a stud and ferrule schedule you can weld without surprises. Start with our shear connector range or write to us through the contact page.

Happy Thanksgiving from the IKING shear stud team in Tianjin.